Master trade blueprint
Cold Room Spare Parts | PU Panels, Condensing Units & Evaporators
Cold room replacement components including PU sandwich panels, condensing units and evaporators. Fits both split cold rooms and monoblock refrigeration systems.
- Ref
- OC-369
- Rev
- Status
- Released
- Class
- Cold Rooms
- Origin
- China · factory named in quote
- Basis
- Written quote only · nothing on this page is priced
- Vectors
-
- OEM — your brand: yes
- ODM — design with us: yes
- Customised to your spec: yes
- Sample before production: no
- Declared
- —
Technical parameters
SPO set per order
| Equipment type | PU Insulated Panel, Condensing Unit, Evaporator | SPO |
|---|
Compliance register
No certifications are listed for this style. Name your market in the dock — we confirm what applies and ask the factory for the evidence before we quote.
Customisation vectors
Pick one — the dock follows
Minimum quantity, delivery time and price depend on what you customise — they come with your written quote, not from a list.
Supply route
Choose an Incoterm in the dock to see where risk passes to you
- R1 Factory China — named in your quote Risk passes to you here
- R2 Sample sign-off You approve before bulk Risk passes to you here
- R3 Pre-shipment inspection Photos and report before the balance Risk passes to you here
- R4 Port of loading China port, confirmed in your quote Risk passes to you here
- R5 Main carriage Sea or air, to the Incoterm you choose Risk passes to you here
- R6 Destination Your market, your port or door Risk passes to you here
| EXW | You collect at the factory, and handle export clearance, freight, insurance and import. |
|---|---|
| FOB | We deliver on board at the port of loading, export-cleared. You book the main freight and insurance. |
| CFR | We pay freight to your port. Risk passes to you once the goods are on board in China. |
| CIF | As CFR, plus minimum marine insurance to your port. |
| DAP | Delivered to your named place, not unloaded. You clear import and pay duties. |
| DDP | Delivered to your named place, import-cleared, duties paid. |
Engineering notes
Materials
PU / EPS insulated panels, refrigeration grade copper pipes, stainless steel optionalCustomisation
- Multiple panel thickness choices
- Various compressor brands & voltage support
- Custom panel size & surface material
Product Introduction
These cold room spare parts can be assembled to build split cold rooms, and also used as replacement spare parts for monoblock cold storage systems.Order gates
Each gate has an owner
-
G0
BriefYou + assistant
Specification, quantity, market and Incoterm are complete
-
G1
Supplier matchOur team
Factories we know, matched to the specification
-
G2
Compliance checkOur team
The rules of your market, and the evidence the factory must supply
-
G3
Written quoteYou accept
Price, quantity, timing — and a landed-cost estimate if you ask
-
G4
Sample sign-offYou
You approve a sample before bulk production
-
G5
InspectionOur inspectors
Photos and a report before the balance is released
Make it yours.
Brief it in a minute.
Tell the assistant your quantity, branding, packaging and port. It asks what the factory will ask, then hands our team a brief with OC-369 already attached.
- Starts with Cold Room Spare Parts | PU Panels, Condensing Un… on your brief
- OEM, ODM or fully customised — it asks what the factory will ask
- Our team turns it into one written quote
This is a typical example of the style — we make it as OEM with your branding, as ODM from your own design, or customised in size, material and finish. Tell me what you want changed, roughly how many, and where it ships — I will build the specification our team quotes from.
Adjacent specifications
Full index for Cold Rooms →| Compare | Key parameters | Vectors | Add to trade brief | |||
|---|---|---|---|---|---|---|
| OC-367 | Walk-in Cold Room Systems | Custom Split Cold Storage Turnkey Projects |
|
On request |
|
||
| OC-368 | Wall & Ceiling Mounted Monoblock Refrigeration Unit For Small Cold Room |
— |
On request |
|
Vectors: O OEM · D ODM · C customised · S sample first · Compliance shows what the factory declares; evidence is requested with your quote

