OC Outsource ChinaSourcing, verified
Projects — built to order

Built for your site.
Not picked from a shelf.

Cold rooms, office and hospitality fit-outs, oxygen and ozone plants. You describe the site and what it has to do; our engineer reviews the drawings; our team quotes the whole job as one written offer — supply, inspection and, where you need it, installation.

  • 10 project lines, 43 reference builds to start from
  • The assistant runs a site-and-capacity interview, not a quantity one
  • One contract, one invoice, pre-shipment inspection on every project
Engineer review before any quote Drawings in, drawings out Install where you need it
Sourcing assistant Example project
OC

Tell me what you need made or sourced. I search what we already supply, work out the specification a factory will ask for, and draft the inquiry for our team.

3 free messages, no account needed to start. Searches 43 live products

Project lines

Every one starts with your site, and ends with one written quote
Built to order

Furniture

8 reference builds

Our strongest category. Indoor and outdoor lines from stock designs; office and hospitality fit-outs built to your drawings as projects. Foshan, Linhai and Guangdong factories.

What the brief needs

  1. Drawings or a mood board
  2. Room count or floor plan
  3. Finish and fabric
Reference builds →
Built to order

Cold Rooms

10 reference builds

PU panels, condensing units, evaporators and monoblocks from a Xiamen engineering firm. Nearly every order here is a project: designed around your site, your temperature and your throughput.

What the brief needs

  1. Room dimensions or a floor plan
  2. Holding temperature and what goes in
  3. Ambient conditions and power at the site
Reference builds →
Standard lines or a project

Oxygen & Ozone Machines

25 reference builds

Ozone generators from portable to kilogram scale, oxygen concentrators and PSA plants, water treatment and sterilisation. Sold as standard machines, or engineered as a project for your plant.

What the brief needs

  1. Flow rate or throughput
  2. Water analysis or air volume
  3. Space and power in the plant room
Reference builds →
How a project runs

Seven steps, one point of contact

The same sequence for a cold room and for a hotel floor. Nothing is manufactured until you have approved drawings and a written quote.

  1. You brief itSite, capacity, drawings or photos — to the assistant or to our team
    Day 0
  2. Engineer reviewWe check the site data and come back with questions, not assumptions
    2–5 days
  3. Design & drawingsLayout, specification and a bill of materials for your sign-off
    With quote
  4. Written quoteSupply, freight, and installation where you want it — one offer
    With quote
  5. ProductionAgainst the approved drawings, with a sample or mock-up where the line allows
    Quoted
  6. Pre-shipment inspectionAgainst the drawings, with photos, before payment is released
    Before release
  7. Delivery & commissioningFreight and customs handled; our installers or your contractor on site
    ✓

Timings are typical, not promises — every project is quoted on its own drawings.

Why it is a project, not an order

A cold room is sized to the product going into it and the heat coming through its walls. A hotel floor is sixty pieces that have to arrive as one matching batch. A treatment plant is engineered to a water analysis. None of that can be picked from a list — so we do not pretend it can.

What you get instead: one engineer who owns the drawings, one contract, one invoice, and an inspection against the drawings before anything ships.

10project lines
43reference builds
1supplier of record
Start a project brief

Need standard products too?

Catalogue lines buyers order alongside a project